This report presents the preliminary findings from a study conducted to investigate the influence of chemical warm mix asphalt (WMA) additives and reduced aging on the viscosity, stiffness, susceptibility to permanent deformation, fracture resistance, and thermal cracking resistance of asphalt binders.
"This report consists of two parts. The first summarizes key details of the Suitability Analysis (SA) model, while the second illustrates the implementation details of the Gravity Land-Use Model (G-LUM). Both modeling approaches have been applied to the Austin region of Texas, but for different case study examples."
Report discussing projects initiated under the American Recovery and Reinvestment Act of 2009 (ARRA), a fiscal stimulus package signed by President Obama on March 6, 2009. State agencies like the Texas Department of Transportation (TxDOT) who received ARRA funds had to report, on a monthly basis, various data on each project in the ARRA program, including staff numbers, hours worked, and payroll. TxDOT asked the Center for Transportation Research (CTR) to identify and isolate specific elements of the 0-6592 database that TxDOT's Construction Division (CST) can implement into an existing TxDot database. This report describes the implementation of the database and procedures for updating it.
Report on the application of a paratransit microsimulation patron accessibility analysis tool in four rural transit agencies in workshops. The workshops provided an overview of the Demand Response Transit [DRT] accessibility tool developed by the research team, obtained feedback on the results predicted by the DRT tool, and identified ways to improve the DRT tool.
In February 2010, The Texas Department of Transportation (TcDOT) contracted with the Center for Transportation Research (CTR) at The University of Texas at Austin, the Texas Transportation Institute (TTI), and The Center for Multidisciplinary Research in Transportation (TechMRT) at Texas Tech University, to assist TxDot in developing a Strategic Research Program (SRP). This report documents the work conducted from September 2010 to August 2011.
This dialog allows you to filter your current search.
Each of the Counties listed note their name and the number of records that will be limited down to if you choose that option.
This dialog allows you to filter your current search.
Each of the Years listed note their name and the number of records that will be limited down to if you choose that option.