World War II Collection - 53 Matching Results

Search Results

Army Mobilization Buildings: Administration Buildings

Description: Administration building plans for mobilization buildings in support of war efforts. Sections feature types A4 to A17 and notes.
Date: 194X
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Construction and Framing Details

Description: Construction and framing details for mobilization buildings in support of war efforts. Sections include plan showing construction of floors, walls, and various types of partitions, and typical framing plan. They feature wall edge lines, measurements, notes, and framing lines.
Date: 19XX
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Duct Shaft Details

Description: Duct shaft details for mobilization buildings in support of war efforts. They include detail thru duct shaft that is vertical to wall, detail thru duct shaft that is parallel to wall, plan above roof detail of smoke pipe for one story building, and other mechanical sections.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Electrical Details

Description: Electrical details for mobilization buildings in support of war efforts. They include explosion proof fixtures, waterproof fixture, reflected plan, typical service diagram, weatherproof fixture with mounting for concealed work and mounting for exposed work, and a legend.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Electrical Details

Description: Electrical details for mobilization buildings in support of war efforts. Sections include explosion proof fixtures, waterproof fixture, reflected plan, typical service diagram, mounting for concealed work, mounting for exposed work, and symbol legend.
Date: 19XX
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Elevation Drawings

Description: Elevation drawings for mobilization buildings in support of war efforts. They include sections titled with a type, detail of work bench, detail of table, detail of shelf over scullery sink, and detail of wood lockers.
Date: 194X
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Elevations & Sections

Description: Mess hall elevation and sections for mobilization buildings in support of war efforts. They include front elevation for a 250 man mess hall, plan showing typical knee brace at walls, cross section, left end elevation, kitchen end elevation, half plan of louver, detail of built up corner, and section of kitchen entrance.
Date: December 19, 1940
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Framing & Foundation Plans

Description: Framing and foundation plans for mobilization buildings in support of war efforts. The set features sections for a 172 man mess hall, and sections include: framing elevation "C", framing elevation "A", floor plan, framing plan, foundation plan, framing elevation "D", framing elevation "B", hood over kitchen ranges, schedule of mess furniture included in this contract, room finish schedule, general notes, kitchen equipment, and graphic scales.
Date: 19XX
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Heating Details & Specifications & Smoke Pipes For Ranges

Description: Heating details for mobilization buildings in support of war efforts. They include detail of heat ducts for buildings with trusses, detail of hanger typical for all mains, detail of heat ducts for 1st floor ceiling, detail of typical ducts at ceiling, detail of smoke pipe manifold, detail of smoke pipes for ranges, detail of sleeve, weights of sheet metal, fresh air intake louver, detail of volume control damper, and typical schematic arrangement of heater room equipment.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Lavatories

Description: Lavatory plans for mobilization buildings in support of war efforts. They include floor plan type L-1(25 Men), type L-2(50 Men), type L-3(100 Men), type L-4(150 Men), type L-5(200 Men), type L-6(250 Men), typical elevations, heater room end elevation, toilet room end elevation, notes, heating cabinets chart, electric fixture schedule, and cannon stoves.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Mess Hall Details

Description: Mess hall elevations and sections for mobilization buildings in support of war efforts. They include front elevation, mess hall end elevation, kitchen end elevation, detail of hinged window guard in store room, detail of concrete curb under counter, detail of built up corner, cross section, and detail of fireproofing back of kitchen ranges.
Date: December 16, 1946
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Mess Hall Floor Plans

Description: Mess hall floor plans for mobilization buildings in support of war efforts. They include a floor plan for 118 men, 170 men, 210 men, and 250 men. Other sections include a legend, electric fixture schedule, gas fixed heating cabinets, kitchen equipment, and general notes.
Date: December 26, 1940
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Mess Halls

Description: Mess hall plans for mobilization buildings in support of war efforts. They include Plan of Mess Hall for 250 Men Showing Plumbing and Electrical Layouts, Plan of Mess Hall for 210 Men, Framing Plan, Legend, Electric Fixture Schedule, Heating Cabinets, General Notes, and Kitchen Equipment.
Date: October 15, 1940
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Details

Description: Miscellaneous details for mobilization buildings in support of war efforts. They include d.h. window, detail of fixed window guard, detail of hinged window guard exterior, detail of hinged window guard interior, horizontally sliding window, exterior door detail, sliding door, interior door detail, sidewall section at water table, detail of shelf and mirror, concrete door sill, concrete pier for footing, porch door, details for recessed radiation, detail of wall framing and fire protection at he… more
Date: July 6, 1940
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Details

Description: Miscellaneous sections for mobilization buildings in support of war efforts. They include d.h. window, detail of fixed window guard, detail of hinged window guard exterior, detail of hinged window guard interior, horizontally sliding window, exterior door detail, sliding door, interior door detail, sidewall section at water table, detail of shelf and mirror, typical details for insulation in exterior walls & first floor construction, concrete door sill, concrete pier & footing, porch door, deta… more
Date: August 6, 1940
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Details

Description: Miscellaneous details for mobilization buildings in support of war efforts. They include section thru landing & steps, section thru heater room & wood floor, section thru interior heater room wall at toilet room, section thru interior stud partition between concrete & wood floor, section thru exterior wall at toilet wash or shower room, typical details of concrete slab on wood floor in areas other than toilet & shower rooms, section thru interior partition occurring between joist, details of ty… more
Date: May 3, 1941
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Details

Description: Miscellaneous details for mobilization buildings in support of war efforts. They include details of skirting, detail of scuttle in ceiling, wardrobe elevation, bulletin board elevation, details of louvers, detail of bench, detail of screened ceiling vent, detail of coal box, details of shelf, roof framing plan at chimney, platform and ladder detail, and graphic scales.
Date: May 3, 1941
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen