(B) the maximum fee shall not exceed $5,000.
(2) The fee to review plans on an expedited basis is $1,000
per unit of equipment included in a contract for which a decal is re-
quired. There is no maximum fee or cap for expedited reviews.
(h) [(i)] Fees for Amendments to Previously Approved Plan
Reviews.
(1) The plan review fee for amendments to previously ap-
proved plan reviews where the installation or alteration of equipment
included in a contract has not been completed shall be as follows:
(A) $100 per unit of equipment for which a decal is re-
quired; and
(B) the maximum fee shall not exceed $2,500.
(2) The fee to review amendments to previously approved
plan reviews on an expedited basis is $1,000 per unit of equipment in-
cluded in a contract for which a decal is required. There is no maximum
fee or cap for expedited reviews.
74.100. Technical Requirements--ASME and ASCE Codes.
(a) The commission adopts the standards for the installation,
maintenance, repair, replacement, alteration, testing, operation, and in-
spection of equipment that are contained in the following codes:
(1) ASME Code A17.1-2007/CSA B44-07 as amended in
subsection (b);[-]
(2) ASME Code A17.3-2002;[]
(3) ASME Code A18.1-2005; and
(4) ASCE Code [Codes] 21.
(b) The following amendments shall be made to ASME Code
A17.1-2007/CSA B44-07:
(1) Delete requirement 1.2.1(c) and all references to ASME
Code A17.7 within the adopted standard, preface and appendices.
(2) Delete requirement 8.10.2.2.1(q) emergency or standby
power operation.
(3) Delete requirement 8.10.2.3.2(1) emergency or standby
power alterations.
(4) Delete requirement 8.10.3.3.2(1) emergency or standby
power alterations.
(5) Delete 8.11.2.2.7 standby or emergency power opera-
tion.
(6) Delete requirement 8.11.2.3.5 emergency and standby
power operation.
(7) Delete requirement 8.11.3.2.3(f) standby power opera-
tion.
(8) Delete the reference to ASME Code A17.3 contained
within [Seetion] 9.1.
(9) Delete Appendix E in its entirety.
(c) The effective dates of:
(1) ASME Code A17.1-2007/CSA B44-07 and the amend-
ments in subsection (b) shall be effective on September 1, 2008.
(2) ASME Code A18.1-2005 shall be effective September
1, 2008.
(3) ASME Code A17.3-2002 continues to be in effect.
74.110. Plan Review--Required.(a) Prior to beginning the installation or alteration of equip-
ment at any individual location, the contractor shall submit and have
approved an application and plans describing the installation or alter-
ation.
(b) The contractor shall submit one (1) copy [two (2) eepies]
of the plans to be reviewed to the department. These copies shall be
submitted in a manner prescribed by the department.
74.111. Plan Review--New Equipment.
(a) A contractor must submit for review an application and
plans for the installation of new equipment.
(b) To apply for a plan review for the installation of new equip-
ment, a contractor must:
(1) submit a completed application on a department-ap-
proved form;
(2) pay the fee required by 74.80; and
(3) submit layout drawings as specified in the ASME Code
A17.1 [cede] adopted in 74.100 for the specific type of equipment to
be installed. These layout drawings shall also include:
(A) the rated speed of the equipment in feet per minute;
(B) the rated capacity of the equipment in pounds;
(C) the total travel of the equipment in feet and inches;
(D) elevation drawings of the hoistway, runway or well-
way; and
(E) plan drawings indicating the arrangement of the
equipment in a machine room, machine space, control room or control
space.
74.112. Plan Review--Alteration of Existing Equipment.
(a) A contractor must submit for review an application and
plans for the alteration of existing equipment.
(b) To apply for a plan review for the alteration of existing
equipment, a contractor must:
(1) submit a completed application on a department-ap-
proved form;
(2) pay the fee required by 74.80; and
(3) submit a written description of the scope of work,
which shall include a description of each alteration to be performed.
(c) In addition to submitting the items under subsection (b), a
contractor must submit layout drawings as specified in 74.111(b)(3)
and the ASME Code A17.1 [eede] adopted in 74.100 for the specific
type of equipment, if the alteration described in subsection (b)(3) re-
sults in one or more of the following changes:
(1) the rated speed of the equipment in feet per minute;
(2) the rated capacity of the equipment in pounds;
(3) the total travel of the equipment in feet and inches;
(4) the classification of the equipment, such as passenger
elevator to freight elevator or freight elevator to passenger elevator; or
(5) the driving machine is re-located.
(d) In addition to submitting the items under subsection (b), a
contractor must submit the following documents for all new equipment
provided as part of the alteration of the interior of an elevator car:
(1) material safety data sheet; and38 TexReg 5646 August 30, 2013 Texas Register
Upcoming Pages
Here’s what’s next.
Search Inside
This issue can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Periodical.
Texas. Secretary of State. Texas Register, Volume 38, Number 35, Pages 5587-5800, August 30, 2013, periodical, August 30, 2013; Austin, Texas. (https://texashistory.unt.edu/ark:/67531/metapth342086/m1/60/: accessed April 27, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; crediting UNT Libraries Government Documents Department.