Texas Register, Volume 3, Number 5, Pages 183-226, January 17, 1978 Page: 224
183-226 p. ; 28 cm.View a full description of this periodical.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
.-- ,, /
224
Volume II will be descriptions of feasible alternatives, an en-
vironmental assessment, and a summary of the public partic-
ipation activities conducted during the development of the
plan. The Water Quality Management Plan for the Brazos
Basin is being developed to satisfy the requirements of Sec-
tion 208 of the Federal Water Pollution Control Act Amend-
ments of 1972, and pursuant to Title 40 Code of Federal
Regulations' Parts 130 and 131 and the State of Texas Con-
tinuing Planning Process. The public hearing shall be con-
ducted in compliance with Section 26.037 (formerly Section
21.089), Texas Water Code. The study area for this plan in-
cludes most of the Brazos River Basin. This plan will not ad-
dress the planning required in the Killeen-Temple Desig-
nated Areawide Planning Area; detailed planning within
that area will be provided through the development of the
Killeen-Temple Areawide Waste Treatment Management
Plan and will not be considered at this hearing.
Copies of the Basic Data Report will be made available for
public inspection at the following locations: Texas Depart-
ment of Water Resources Offices, Stephen F. Austin Build-
ing, 1700 North Congress Avenue, Austin, Texas; Texas
Department of Water Resources District 1 Office, 301 South
Polk, Room 306, Amarillo, Texas 79106; Texas Department
of Water Resources District 2 Office, 4819 Avenue Q, Lub-
bock, Texas 19412; Texas Department of Water Resources
District 4 Office, 203 James Collins Boulevard, Duncanville,
Texas 75116; Texas Department of Water Resources District
7 Office, 2318 Center Street, Deer Park, Texas 77536; Texas
Department of Water Resources District 9 Office, 133 West
Concho, San Angelo, Texas 76903; and the Brazos River
Authority Office, Waco, Texas. Copies of Volume II, Plan
Summary Report, will be made available at these same loca-
tions when completed in June, 1978. However, the hearing
cited in this notice will consider only Volume I, Basic Data
Report, of Water Quality Management Plan for the Brazos
Basin.
Requests for copies of the Basic Data Report and questions
about it should be addressed to Jack Kramer, Texas Depart-
ment of Water Resources, P.O. Box 13087, Austin, Texas
78711, or call (512) 475-3454. When requesting a copy or
sending a query by mail, please include your complete return
address and telephone number.
The public is encouraged to attend the hearing and to present
evidence or opinions as to the accuracy of the existing and
projected data compiled in the Basic Data Report. Written
testimony which is submitted prior to or during the public
hearing will be included in the record. The hearing commis-
sion would appreciate receiving a copy of all testimony at
least five days before the hearing. The testimony and ques-
tions concerning the public hearing should be addressed to
Gordon W. Houser, Texas Department of Water Resources,
P.O. Box 13087, Austin, Texas 78711, or call (512) 475-5516.
The date selected for this hearing is intended to comply with
deadlines set by statute and regulation. Any publication or
receipt of this notice less than 30 calendar days prior to the
hearing date is due to the necessity of scheduling the hearing
on the date selected.
This public hearing may be continued in order to fully
develop the evidence.
Doc. No. 780206(Editor's note: Another public hearing to receive testimony
concerning Volume I, Basic Data Report, of the Water Quality
Management Plan for the Brazos Basin will also beheld. This
notice is exactly the same as the preceding notice, with the
exception of the following date, time, and place of the hear-
ing:)
1:30 p.m. February 1, 1978Brazos River Authority
4400 ,Cobbs
Waco, Texas
Doc. No. 780207Colorado Basin
A hearing commission of the Texas Department of Water
Resources will conduct a public hearing beginning at 1:30
p.m. January 31, 1978, in the Old Grand Jury Room of the
Old County Courthouse, 301 Oak, Abilene, Texas, in order to
receive testimony concerning Volume I, Basic Data Report, of
the Water Quality Management Plan for the Colorado Basin.
This document is the first of two volumes which, upon com-
r letion of Volume II, will form the Water Quality Manage-
ent Plan for the Colorado Basin. Volume I, Basic Data Re-
sort, includes information on existing wastewater treatment
facilities; existing water quality; existing land-use patterns;
existing population; and projections of economic growth,
population, and probable land-use patterns. Volume II, Plan
Summary Report, will present the recommended plans for
water quality management and the legal, financial, and in-
stitutional requirements of each plan. Also included in
Volume II will be descriptions of feasible alternatives, an en-
vironmental assessment, and a summary.of the public partic-
ipation activities conducted during the development of the
plan. The Water Quality Management Plan for the Colorado
Basin is being developed to satisfy the requirements of Sec-
tion 208 of the Federal Water Pollution Control Act Amend-
ments of 1972, and pursuant to Title 40 Code of Federal
Regulations' Parts 130 and 131 and the State of Texas Con-
tinuing Planning Process. The public hearing shall be con-
ducted in compliance with Section 26.037 (formerly Section
21.089), Texas Water Code. The study area for this plan in-
cludes the entire Colorado River Basin in Texas, and Tres
Palacios Creek and Bay in the Colorado-Lavaca Coastal
Basin. Copies of the Basic Data Report will be made availa-
ble for public inspection at the following locations: Texas
Department of Water Resources, Stephen F. Austin Building,
1700 North Congress Avenue, Austin, Texas; Texas Depart-
ment of Water Resources District 3 Office, 3221 Franklin,
Waco; Texas Department of Water Resources District 7 Of-
fice, 2318 Center Street, Deer Park; Texas Department of
Water Resources District 8 Office, 4713 Rigsby Avenue, San
Antonio; Texas Department of Water Resources District 10
Office, 602 South Cedar Street, Pecos; Texas Department of
Water Resources District 12 Office, 505 South Water Street,
Corpus Christi; Colorado River Municipal Water District Of-
fice, 400 East 24th Street, B'Wg Spring; Concho Valley Council
of Governments Office, 7 West Twohig Building, San Angelo;
and the Lower Colorado River Authority Office, Tom Miller
Dam, Austin. Copies of Volume II, Plan Summary Report,
will be made available at these same locations when com-Volume 3, Number 5, January 17, 1978
>'. u.
Upcoming Pages
Here’s what’s next.
Search Inside
This issue can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Periodical.
Texas. Secretary of State. Texas Register, Volume 3, Number 5, Pages 183-226, January 17, 1978, periodical, January 17, 1978; Austin, Texas. (https://texashistory.unt.edu/ark:/67531/metapth252892/m1/42/: accessed April 27, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; crediting UNT Libraries Government Documents Department.