19 Matching Results

Search Results

Grade School Building, Haskell, Texas: Floor Plan

Description: Floor plan for a grade school building in Haskell, Texas. It includes a detailed floor plan, window schedule, door and transom schedule, locker room plan, room and finish schedule, and partial floor plan showing classrooms replacing stage 4 part of auditorium as called for under alternate "C."
Date: 1936~
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First Baptist Church Addition, Rule, Texas: First and Second Floor Layouts

Description: First and second floor layout additions to First Baptist Church in Rule, Texas. It includes two large drawings, one of the first floor layout and the other of the second floor layout; both drawings contain notations and labels showing where everything is located. There is a door schedule, window schedule, and a key to the materials on the left side of the sheet.
Date: June 1949
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building Rebuild, Haskell, Texas: Foundation and Basement Plan

Description: Foundation and basement plan to rebuild a high school building in Haskell, Texas. It includes a layout of the building's foundation and basement, section through boiler room stair, section and plan of janitor's stair, section showing boiler room sash construction, typical grade beam section, and stirrup schedule.
Date: 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Homemaking Building, Haskell, Texas: Plans and Schedules

Description: Plans and schedules for a homemaking building at the high school in Haskell, Texas. It includes floor plan, roof plan, foundation plan, typical grade beams, splash block detail, door schedule, window schedule, finish schedule, grade beam schedule, footing and pier schedule, and lintel schedule.
Date: 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen