1,544 Matching Results

Search Results

Texas Freight Density

Description: Map of Texas depicting the freight density of the various railroad networks within the state. The number of annual rail tons is designated on the map by a different color and thickness of line.
Date: 2010
Creator: Texas. Department of Transportation.
Partner: UNT Libraries Government Documents Department

Texas Current Passenger Rail

Description: Map depicting the various passenger rail lines running in the state of Texas. Different lines are designated by different colors and includes AMTRAK Passenger Lines, Dallas Transit System, Capital MetroRail, and Houston MetroRail.
Date: 2010
Creator: Texas. Department of Transportation.
Partner: UNT Libraries Government Documents Department

Texas Rail Studies

Description: Map showing the various freight rail studies conducted by the Texas Department of Transportation. Each study area is designated in a different color on the map. There is an inset table with additional information about each study.
Date: 2010
Creator: Texas. Department of Transportation.
Partner: UNT Libraries Government Documents Department

Texas State Railroad Map: 2012

Description: Map of Texas depicting the railroad network within the state. Each railroad line is shown with a different color. There are insets for the Dallas/Fort Worth region as well as the Houston region.
Date: 2013
Creator: Texas. Department of Transportation.
Partner: UNT Libraries Government Documents Department

Texas State Railroad Map: 2009

Description: Map of Texas depicting the railroad network within the state. Each railroad line is shown with a different color. There are insets for the Dallas/Fort Worth region as well as the Houston region.
Date: 2010
Creator: Texas. Department of Transportation.
Partner: UNT Libraries Government Documents Department

Texas County Mapbook

Description: Book of maps of Texas counties depicting major roads, military facilities, and state properties.
Date: 2010
Creator: Texas. Department of Transportation.
Partner: UNT Libraries Government Documents Department

[North San Gabriel River Bridge on U.S. Highway 81]

Description: Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows excavation for footing of pier number 2, North San Gabriel River bridge. Lower half of a men win overalls and work gloves can be seen next to tubes.
Date: July 18, 1939
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[North San Gabriel River Bridge on U.S. Highway 81]

Description: Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows excavation for footing east let of pier number 2, North San Gabriel River bridge. Shovel, pick axe and bucket can be seen.
Date: July 18, 1939
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Berry Creek Bridge on U.S. Highway 81]

Description: Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows forms after placing concrete pier number 2, Berry Creek bridge.
Date: July 18, 1939
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[U.S. Highway 79 Construction]

Description: Control 246. Highway 43 (Old Designation) Project 204, Williamson County. Salvaging and replacing old gravel base course. Views of construction equipment including graders, tractors, and trucks.
Date: 1936
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[U.S. Highway 79 Construction]

Description: Photograph of Control 204 Highway 43 (old designation) Project 204. Lengthening multiple box culvert at Allison's Lake. Men standing on culvert. Barrels on the ground and barns in the distance.
Date: 1936
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[U.S. Highway 79 Construction]

Description: Photograph of Control 246 Highway 43 (old designation) Project 204. Loading gravel base material with 1 1/4 yard Marion shovel rented from Joe Mocken, Austin. Summer 1936
Date: 1936
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[U.S. Highway 79 Construction]

Description: Photograph of Control 246 Highway 43 (Old Designation) Project 204. Loading gravel base course with 1 1/4 yard Osgood rented from F.C. Crane Co., Dallas. Summer 1936. Two men, trucks and construction equipment.
Date: 1936
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[U.S. Highway 79 Construction]

Description: Photograph of Control 246 Highway 43 (old designation) Project 204. Dumping base course through Thrall. Summer 1936. Cars and buildings with a water tower in the distance.
Date: 1936
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Photograph of Rounded Turn of Road]

Description: Photograph of a rounded turn area of a road. On either side of the road are open fields and on the road is one dark color car. In front of the car there are two buildings visible along the rounded turn.
Date: unknown
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Photograph of Roadside]

Description: Photograph of the roadside of an unknown road. In the foreground the cracked asphalt of the road is visible and in the background is an open empty field.
Date: unknown
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Erosion at Berry Creek Bridge]

Description: Photograph of IH 35 access road in Williamson County. Damage to riprap at Berry & Dry Berry Creek bridges by flood on May 16, 1965. Taken May 19, 1965. Looking west showing erosion of base and pavement at north end.
Date: May 19, 1965
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Damage to Berry Creek Bridge]

Description: Photograph of access road alonge IH 35 in Williamson County. Damage to riprap at Berry & Dry Berry Creek bridges by flood on May 16, 1965. Taken May 19, 1965. Looking west showing erosion of base and pavement at north end.
Date: May 19, 1965
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation
Back to Top of Screen